2021 Road Improvement Program Bid

Project:

2021 Road Improvements Program (Contract #2023) 

General Contractor:
Newport Construction

Town Contact:
Stephane Cherduville, Public Works Engineer, Concord Public Works – Engineering Division, 978-318-3210, scherduville@concordma.gov

Bids for this project were open on April 15, 2021 - the Engineering staff with Hayner Swanson, Inc. (HSI) assistance analyzed the bid tenders and recommended the contract be awarded to Newport Construction which was the lowest responsible bidder.

The 2021 Roads Program contract with Newport Construction Corporation includes the reclamation and repaving of Peter Spring Road, Prescott Road, Arrowhead Road, Cranefield Road and Minuteman Drive.


Newport Construction started the catch basin cleaning work on May 27, 2021






Concord Public Works has also identified areas in town which requires more in-depth, localized treatment of the road surface to extend its serviceable life.  As such, the following locations have been identified to receive “mill & fill” treatments, and are included as part of the 2021 Road Improvement Project tender package:

LOCATION

LENGTH

WIDTH

SQ. YDS

Lang @ Monument St.

16

25

44

1597 Monument St.

12

13

17

Sudbury St. at Grant St.

45

14

70

Laws Brook Rd @ Warner St.

33

10

37

845 Barret Mills Rd.

26

21

61

560 Old Bedford Rd

20

12

27

LOCATION

LENGTH

WIDTH

SQ. YDS

Old Pickard Rd (Various locations)

1271

Sorrell Rd. $ Shagbark Rd.

75

26

  217

Elm St, (Various locations)

  643

Based on the availability of funding sources additional roads are to be selected by Engineering Staff, to also be reconstructed or to receive a mill & fill treatment  during the 2021 construction season.

Updated 7/15/21