National Pollutant Discharge Elimination System (NPDES) Phase II Stormwater Management Program
The new Town of Concord Stormwater Regulations and Public Works Design Standards and Details were adopted by the Public Works Commission in a hearing March 15, 2011 consistent with the requirements of MGL Chapter 83 Section 10. The standards and regulations clarify stormwater management plan and erosion control plan submittal requirements for projects requiring technical stormwater review by Town staff through existing Town Board and Commission permit processes or projects not requiring board or commission permits, but disturbing 1 or more acres of land.
Any questions on the standards or details or the NPDES Phase II Stormwater Program can be directed to the Town Engineer, William Renault at 978-318-3210 or by
email.